AI-assisted RCA grounded in failure history, SOPs, and survey data.

In Review

RCA-2026-014 · Asset P-101

Pump P-101 recurring mechanical seal failure

Pump P-101 has experienced three mechanical seal failures in 14 months, the most recent causing 14 hours of unplanned downtime on the crude charge train.

Event Timeline

  1. 2025-03-27

    Seal weep observed, faces replaced

  2. 2025-11-02

    High vibration trip, coupling realigned

  3. 2026-05-18

    Full seal failure, 14h downtime

5 Whys

  1. 1Why did the pump trip? — Mechanical seal failed and leaked.
  2. 2Why did the seal fail? — Seal faces overheated and lost lubrication.
  3. 3Why did faces overheat? — Flush flow was insufficient.
  4. 4Why was flush flow insufficient? — Flush line orifice was fouled.
  5. 5Why was the orifice fouled? — No strainer / quench on a fouling-prone service.

Identified Root Cause

Inadequate seal flush design for a fouling-prone service: API Plan 11 alone cannot maintain flush flow once the orifice fouls.

Recommended Actions

ActionOwnerPriority
Add API Plan 62 external quenchReliability Eng.high
Install flush line strainer with DP monitoringMaintenancehigh
Re-baseline vibration after next seal changeCondition Monitoringmedium